- Work Activity Requirements
- Engineer (or assigned lead) completed Construction Risk Assessment Workshop (CRAW). Note: Apply principles of safety in design to eliminate and minimise risks (when designing structures, layouts, hardware and/or temporary works).
- Engineer (or assigned lead) briefed Delivery team on Construction Execution Procedure (CEP) complete. Note: CEPs to be prepared for all complex, high-risk activities. For all other construction activities CEPs are to be prepared at the discretion of the Project Manager.
- Supervisor facilitated activity specific Safe Work Method Statement (SWMS)/Job Safety & Environment Analysis (JSEA) with workers. Note: SWMS are only required for High-Risk Construction Work.
- Workers have completed START Cards, understood them and all involved have signed.
- Engineers, supervisors and workers Checked for Change and reviewed the effectiveness of risk control measures.
- If it’s not safe, workers should not start activity and notify supervisor immediately.