• Temporary works must be identified, coordinated/managed, designed and independently verified by appropriately qualified and approved persons appropriate to the level of the risk.
  • A Temporary Works Category Evaluation must be completed to determine the appropriate experience of the Designer, Verifier and Site Validator.
  • A competent person/s with relevant experience and qualifications must be appointed to undertake the duties of Temporary Works Coordination.
  • Prior to using proprietary products, obtain specifications to understand its intended use and its compliance with applicable standards. Check if additional design and certification is required.

Design Change Management

  • The Project Manager and Project Engineering Manager must be consulted before proceeding with any changes to designs in the issued for construction stage.
  • Temporary works changes must not occur without prior acceptance by the designer, and where required, completion of revised certification and independent verification.

 

Safety in Design (SID) Risk Assessment

  • Planning and use of temporary works must be design risk assessed (Safety in Design) and conducted by competent persons with relevant experience and qualifications.