• All temporary works must be assessed to identify where a design is required.
  • All temporary works, including proprietary temporary works, must be installed in accordance with the manufacturers’ instructions or design documentation.
  • All temporary works must be inspected prior to use to validate its correct installation.
  • Physical protection must be installed to protect temporary works where there is a risk of collision, or damage from operating plant or live traffic.